Estimação de estados em sistemas de distribuição: uma abordadgem trifásica e descentralizada

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

Universidade Federal de Juiz de Fora (UFJF)

DOI

Abstract

This work aims to present a methodology for static state estimation in electric power distribution systems. Branch currents are used as state variables. Measurements are obtained by means of Phasor Measurement Units (PMUs), in which voltage and current branches measurements are used. The approach is three-phase, thus represents the distribution system characteristics. The methodology consists of solving a nonlinear optimization problem minimizing a quadratic objective function associated with the estimated measurements and states subject to load constraints for the non monitored loads based on estimated load obtained from the ‘t-1’ instant, starting from the assumption that in short time intervals the load does not have large variations, which together with the the three-phase approach are the main contributions of this work. Another contribution of this work is the descentralided approach, with this assumption the network can be divided into several subnetworks that can be solved separately and independently. This speeds up the process of being solved from a computational point of view and allows the use of parallel processing, since there is already a natural parallelism among tasks to be solved. Another advantage of the division into subsystems is the fact that the monitoring areas of interest. With the aim of allowing the decentralization was proposed PMUs allocation strategy that consists of allocating two units for each lateral feeder, one at the beginning and one at the end, trying to use as little PMUs as possible in such a way that the quality of the estimated states are not compromised. The resolution of the optimization problem is done through a computer implementation of Interior Point Method with Security Barrier (SFTB - IPM) proposed in the literature. The PMUs measurements were emulated using a Three-PhasePowerFlowusingtheCurrentInjectionmethod(FPTIC).Severalsimulations were performed varying the load percentage and the results obtained were compared with other existing methodology in literature and also the true values that were obtained from the FPTIC to non monitored loads. The computational time using serial and parallel processing were also compared. Results show good results which makes the proposed methodology applicable in monitoring distribution systems.

Description

Citation

Endorsement

Review

Supplemented By

Referenced By

Rights and licensing

Acesso Aberto