Estudo do impacto da incorporação de usinas hidrelétricas a fio d’água no sistema interligado nacional
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Universidade Federal de Juiz de Fora (UFJF)
DOI
Abstract
The Ten-year Plan for Expansion of Energy (EPE, 2010) presents the expansion of offer
(not auctioned) 100% tied to power generation based on renewable sources: hydro, wind
and thermal power plants with biomass burning. Encouraging greater participation in
renewable energy sources is a commendable attitude of the Brazilian government that
somehow tries to minimize the expansion contracted in the auctions of new energy by
the year 2008, based heavily on fuel oil fired plants. Most hydroelectric ventures
considered viable for the period is located in the Amazon region and due to social and
environmental restrictions there is no provision for deployment of power plants with
reservoirs of regularization of inflows.
The high participation of large hydroelectric without reservoirs implies in several
consequences for the operation of the National Interconnected System (SIN), such as
reduced availability of maneuvers for flood control; a higher demand of the existing
reservoirs; and order more frequently thermoelectric power plants to achieve the
seasonal demands of the load. Moreover, trade impacts can be envisioned, such as
increased volatility of the Settlement Price Differences, increased risks of hydrological
plants participating in the MRE and higher order of power plants in order of economic
merit.
This paper analyzes problems such as decreased ability to multi-annual adjustment of
the reservoirs and the need for increased participation in order to conserve thermal
energy security of the SIN. Uses NEWAVE model to examine different scenarios of
inflows based on historical hydrological series and synthetic overviews analyzing future
market developments and energy. Moreover, studies carried out on the option of
expanding the supply of energy by large dams to trickle over plants with reservoirs of
regularization, for it carries out simulations by modifying the physical characteristics of
UHE Jirau in order to compare the results among the alternatives.
Description
Keywords
Custo marginal de operação , Segurança energética , Preço de liquidação de diferenças , Expansão da geração de energia , Capacidade de armazenamento , Grau de regularização , Marginal cost of operation , Energy security , Price settlement of differences , Expansion of power generation , Storage capacity , Degree of adjustment
Citation
Endorsement
Review
Supplemented By
Referenced By
Rights and licensing
Acesso Aberto
