A gestão de projetos em órgãos públicos – um estudo de caso em unidades de saúde na Prefeitura de Juiz de Fora
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Universidade Federal de Juiz de Fora
DOI
Abstract
In Brazil, when it comes to health buildings, the government is essential
considering that is responsible for the constructions of buildings for public service.
Being the health buildings spaces designed for health care of the population, it
has an important role to society, so the professional architecture must ensure the
project meets the required functions for this type of building: comfort, durability and
flexibility. Therefore, this type of construction presents a need for more planning to
organize, as they are increasingly flexible and complex.
It’s known that the project process is a recurring theme in academia and has
been discussed by both authors focused on its recognition as, by hypothesis, in its
improvement. However, a larger part of research conducted around the theme
project process in construction is facing for enterprises in the private sector, where
there isn’t a bureaucratic process involving directly or indirectly the municipality, the
state or the Union.
The lack of planning and oversight even during the project process of a public
building is identified as causing waste of resources by some authors. Thus, there is a
force so there is an increase of quality in the project process so that the end result is
quality works with it without deadlines and costs are high.
Thus, this study will be point out how the process is carried out by the
Subsecretaria de Coordenação e Projeto (SSCP) leased the Secretaria de Obras of
the prefecture of the city of Juiz de Fora, Minas Gerais.
The work is guided by a literature review and case study performed at
prefecture of the city, cutting the number of public works made by the same, the units
of primary health care (UAPS).
The method of investigation proceeded content analysis of the administrative
process and conducting semi-structured interviews with the responsible e
professionals for SSCP.
The results showed the steps of the project process undertaken by the public
agency in question, and point out the difficulties faced during the course of this
process, particularly in relation to health facilities, thus contributing with
recommendations for possible chances to improve processes and future guidelines
xii
aimed at achieving a more organized project process, reducing rework and which
allows the execution of work with fewer interferences.
Description
Keywords
Citation
Endorsement
Review
Supplemented By
Referenced By
Rights and licensing
Acesso Aberto
