Metodologia para o rateio do bloco hidráulico no planejamento hidrotérmico de médio prazo
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Universidade Federal de Juiz de Fora (UFJF)
DOI
Abstract
The efficiency in the operation of predominantly hydrothermal systems, as the Brazilian
Interconnected System (SIN), is closely related to the execution of a consistent
operation planning. The strategical decision models used in long term studies are
capable to determine the operative politics that minimizes the operation costs and the
risks of deficit by using an energy equivalent reservoirs modeling. This work deals with
a proposal that may be coupled to a strategical decision model by the expected cost to
go function, in order to allow the disaggregation of the subsystems’ into its the
individual reservoirs, for every month and for each streamflow sequence. So, the
proposal is the development of a model where it is possible to verify if the subsystems’
generation global goals, supplied for the strategical decision models, are reachable. To
work in such way, the tool disaggregates the solution found for the energy equivalent
systems to the individualized plants. The methodology has two modules: in the first one
the optimal dispatch of the energy equivalent subsystems is done with an iterative linear
programming routine and the global generation goals for each one of the subsystems are
found, considering the energy interchange between them. The second module, is an
individualized plants nonlinear optimizer modeled for dispatching the hydroelectric
plants of each subsystem separately, in order to try to reach the generation goals defined
by the previous module and to maximize the reservoirs’ levels. The innovation of this
model is the individualized plants simulation module, which is not based on heuristic
rules, but in a nonlinear programming routine (NLP). The use of optimization
techniques diminish the interference of the user in the simulation process, since his
knowledge is usually based on the experience acquired throughout the operation history.
Moreover, the methodology dismisses the adaptation of the model whenever new
operative politics are adopted. Thus, this model, after the validation process, may dawn
as an alternative to the simulation model that is officially used by the Brazilian
Electrical Sector (SEB), whose individualized plants simulation module is based on the
politics of the parallel operation of the reservoirs.
Description
Citation
Endorsement
Review
Supplemented By
Referenced By
Rights and licensing
Acesso Aberto
